Experience

Completed projects

Every item on this page is work delivered, not a capability offered.

PLC migration

  • Planned and documented migration from Allen Bradley to Emerson

Electrical cabinet build

  • Electrical and control cabinet for a gas diversion damper
  • Electrical and control cabinet for a sewage treatment plant

PLC maintenance

  • Allen Bradley ControlLogix — gas metering station
  • Emerson RX3I-SAMS — gas diversion damper
  • Mitsubishi R08PSFCPU — auxiliary boiler
  • Phoenix Contact ILC 330 PN — flue gas monitoring
  • Siemens S7-400 and S7-1200 — water treatment plant

Industrial communications

  • Configuration of SEL RTAC
  • Configuration of OT and IT switches
  • SEL RTU to SITREM communication for heat rate calculation
  • Communication setup for custody transfer meters

Server maintenance

  • Mark VI servers
  • EWS, SPOA and SPOB servers — ABB Symphony Plus
  • DSASP, IMSP and CS1P servers — ABB 800xA

Industrial raceways

  • Installation of conduit, cable tray and wire mesh tray for power, voice and data

Low-voltage switchboards

  • Corrective and preventive maintenance on distribution switchboards
  • Corrective and preventive maintenance on load centres
  • Maintenance and technical support on MCC and motor control panels

Power quality

  • Estudios conforme al Código de Red 2.0 — RES/550/2021
  • Integration of energy management and power quality systems
  • Implementation of energy monitoring systems (SCADA)

What is happening in your plant?

Let us start by understanding your plant.